Professional programmes · Technical knowledgeService information
International Accreditation Center
Verify a recordMy account

IAC Library

Understanding a scope extension

A new activity must be compared with what the current scope covers.

Start from the published scope.

Identify the entity, the reference, the status and the activities covered. Describe the difference between that scope and the activity to be added.

Specify what changes.

A change may affect methods, sectors, products, sites or conditions. Relate that change to the relevant responsibilities and resources.

Consult the responsible entity.

The conditions for examining an extension belong to the responsible scheme and body. This guide is technical information and does not constitute an offer of accreditation extension by IAC.

Related information.

Guidance material for interpreting information and preparing an inquiry. The conditions of a service or an assessment are confirmed in the corresponding programme.

Download the guide (TXT)Back to the librarySubmit an inquiry